Process
1. Deep cleaning with steam technology
Dirt or grease are fully removed
2. Drying with microfibre towel
Absort water residue
3. Applying coating on dry and cleaned surface
Penetrate and bond well with the surface substrate
Self levelling to solve the uneven flooring
4. Hardening period will take place about 4 hours
The area can be allowed to use or access
The full curing period will take place in 7 days to reach the maximum hardness.



