Process

1. Deep cleaning with steam technology

            Dirt or grease are fully removed

2. Drying with microfibre towel

            Absort water residue

3. Applying coating on dry and cleaned surface

             Penetrate and bond well with the surface substrate

             Self levelling to solve the uneven flooring

4. Hardening period will take place about 4 hours

             The area can be allowed to use or access

             The full curing period will take place in 7 days to reach the maximum hardness.








Go to top of page